Engineers, Developers & Contractors

Town Stormwater Permit

The Town of Hope Mills operates under a NPDES Phase II Stormwater Permit. Development activity is regulated by the town as a requirement of this permit.

Drainage Structures Installed in the Town Limits

All drainage structures within the Town of Hope Mills must be designed and constructed in accordance with the Town of Hope Mills Stormwater Drainage Design Standards (PDF). These standards apply to all drainage structures to be installed within the Town of Hope Mills without regard to development size.

Phase II Post Construction Rules

New development within the Town of Hope Mills may be subject to the Phase II Post-Construction guidelines as defined in the Phase II Post-Construction Article of the Stormwater Management Ordinance - Chapter 67 of the Town of Hope Mills Code of Ordinances.

Download the Town of Hope Mills Administrative Manual (PDF) for the Implementation of Phase II Post-Construction.

The Town of Hope Mills utilizes the standards outlined in the most current edition of the North Carolina Department of Water Quality’s Best Management Practices Manual.

Additional Information or Questions

For more information regarding these rules, contact the Stormwater Department at 910-424-4555 ext. 3516.